Headlines and Fun Stuff!More InformationData and Documents
Contact Us
 

 

The Dead Space Survey documented the current condition of every tomb. The links below show the condition of the primary structure, the roof and the stucco and surface finish of each tomb.



St. Louis Cemetery No. 1
Link to History
Current Level, Return to Introduction
Link to Site Thru Time
Link to The Project
Link to Resources

 

Conditions

Primary Structure - The principle body / component of the tomb or marker.

Roof - The top covering of the tomb or marker.

Stucco - The exterior coating of lime/cement/sand generally applied to the primary structure.

Surface Finish - Paints or washes applied to stucco or to the masonry or metal substrates.


Tombs & Markers


Project Work


Historic Preservation Program, Graduate School of Fine Arts
University of Pennsylvania, Copyright 2002/2003