Headlines and Fun Stuff!More InformationData and Documents
Project ToolsEsteve Tomb Pilot ProjectPerrault Tomb Pilot ProjectBergamini Tomb Pilot ProjectMeasured Drawings from TulaneTombscapesSave America's Treasures ProjectContact Us
 

 

Pilot Approach - Conservation and Partial Restoration. Tablet structure and portions of the original stucco were conserved, while much of the missing stucco was replicated. The pilaster moldings were replicated based on the original evidence. The tomb was finished with an oyster-shell based limewash.



St. Louis Cemetery No. 1
Link to History
Link to Maps
Link to Site Thru Time
Current Level, Return to Introduction
Link to Resources

 

Perrault Tomb #351

Text and images adapted from Dorothy Krotzer and Frank G. Matero, PIlot Tomb Project Report, 2002.



Tombs & Markers



Project Work


Historic Preservation Program, Graduate School of Fine Arts
University of Pennsylvania, Copyright 2002/2003